Belgrade and surrounding area

EV charger installation.
At home. At work.

Site assessment, electrical preparation and AC charger installation for houses, shared garages and business premises.

We agree on the scope, price and schedule before work starts.

From wiring to charging.AC
01Assessment02Installation03Checks

First, we assess the site.
Then we choose a suitable solution.

One parking space or several chargers — we plan the installation around the vehicle, available power and how it will be used.

01 · Where we install

Charge where you park.

01

House or private garage

One space for daily charging. We check the existing wiring, the route to the parking space and the capacity to add a charger alongside other electrical loads.

02

Apartment building

One or more garage spaces. We plan the supply, charger access and energy monitoring around users’ needs and the equipment’s capabilities.

03

Business and workplace parking

Charging for company vehicles or employees. We consider the number of vehicles, parking time, simultaneous charging and future expansion.

02 · Scope of service

From site inspection to charging checks.

Installation starts with an assessment of the supply and cable route. We define the work and required equipment in the quote before we begin.

01.

Assessment and plan

Inspection of the supply, distribution board, existing load and parking space. Agreement on charger location and cable route.

02.

Electrical preparation

A dedicated circuit, required protection and distribution work according to the existing installation, selected equipment and agreed scope.

03.

Installation and setup

Mounting the AC charger and setting the available power. Access, connectivity and load management where the chosen system supports them.

04.

Checks and handover

Checking the completed installation and charging function. Explaining operation and handing over the agreed information and documentation.

03 · Choosing a solution

Power that suits your vehicle and site.

The vehicle’s supported AC charging power, the electrical supply and how long the car is parked all matter. A higher charger rating alone does not mean faster charging.

We also check whether load management is possible, so charging can adapt to the building’s other consumption — with compatible equipment.

Examples of AC charger ratings

7.4 kWSingle phase
11 kWThree phase
22 kWThree phase

These are not guaranteed power levels for every site. Actual charging power depends on the vehicle, supply, settings and operating conditions.

More parking spaces?We consider power sharing and future expansion from the first installation.

04 · Installation cost

A quote based on the actual installation.

The cost depends on the route, distribution board condition, required protection, number of chargers and additional setup. After assessment, you receive a quote with labour and materials listed separately.

Send details for an assessment
01
Cable route and installation methodDistance from the board to the parking space, passages, surfaces and site access.
02
Existing electrical installationDistribution condition, available power and the extent of any adaptations.
03
Charger and additional functionsNumber of devices, mounting method, user access and load management.

05 · Common questions

Before you choose a charger.

I already have a charger. Can you install it?

Send the exact model and device documentation. Before agreeing on the work, we check the charger’s requirements and the existing installation, then confirm the scope.

Do I need a higher-capacity electricity connection?

This depends on the existing capacity, other loads and charging needs. We assess the site first. Different power settings or load management with suitable equipment may be an option; a supply upgrade is not assumed.

Can I install a charger in my shared garage space?

We first consider the supply source, cable route, energy monitoring and any agreements or permissions needed for the particular building. The solution is agreed with the property owner or manager before work begins.

How long does installation take?

We confirm the schedule after inspection and agreement on the scope. Route length, distribution work, mounting method and parking-space readiness affect the duration.

Can I prepare the wiring now and add the charger later?

Yes. We can agree on route and electrical preparation during construction or refurbishment. The planned location, number of chargers and future system requirements need to be defined in advance.

We provide a two-year warranty on completed work from handover. Manufacturer terms apply to the equipment.

06 · Contact

Tell us where you want to charge.

Start with the location, building type and number of parking spaces. If you already have a vehicle or charger, include the model.

WhatsApp opens with a prepared message; you choose when to send it.
Monday–Friday 08–17 · Saturday 08–14

What helps with the assessment?

  • House, apartment building or business premises
  • One parking space or several chargers
  • Approximate distance from parking to the distribution board
  • Vehicle and charger models, if known
  • Photos of the space that you can take safely, without opening electrical equipment
Or write to info@faza.rs
CallWhatsApp